This website requires JavaScript.
Explore
Help
Sign In
1b-agent
/
OneCAD
Watch
1
Star
0
Fork
0
forked from
1b-agent/solidcraft-upstream
Code
Pull Requests
Activity
Files
ade30e9c4e43dbe5f796ac922fc693edc61a7846
OneCAD
/
crates
/
mcp
/
src
T
History
CypherNaugh_0x
ab23fc9906
A failed MCP batch goes back to where it started however long the undo history is: rollback undid as many steps as the undo history had grown, but the history is capped at 200 steps, so once it was full a failed batch reported undone: 0 and left its sketches behind (an empty Sketch1, two sketches named TapHole). New commands edit.checkpoint and edit.restore_checkpoint (forget: true drops one) remember and restore the design, the active sketch and the undo history; batch takes a checkpoint before its first step, restores it on a failure and forgets it on success. Against an app without checkpoints batch falls back to counting undo steps
2026-10-10 17:21:25 -04:00
..
backend.rs
MCP: server and tools
2026-10-07 19:25:27 +00:00
lib.rs
MCP: server and tools
2026-10-07 19:25:27 +00:00
server.rs
Command ids are SolveCraft's own: 173 ids that were another product's internal command ids become dotted, lower-case ids (<area>.<thing>[.<variant>]: solid.extrude, sketch.rectangle.two_point, sheet.flange, joint.drive, ...), in the registry, toolbar, dialogs, shortcuts, palette, control channel, MCP, examples, scenarios and docs
2026-10-09 12:17:23 +00:00
tests.rs
A failed MCP batch goes back to where it started however long the undo history is: rollback undid as many steps as the undo history had grown, but the history is capped at 200 steps, so once it was full a failed batch reported undone: 0 and left its sketches behind (an empty Sketch1, two sketches named TapHole). New commands edit.checkpoint and edit.restore_checkpoint (forget: true drops one) remember and restore the design, the active sketch and the undo history; batch takes a checkpoint before its first step, restores it on a failure and forgets it on success. Against an app without checkpoints batch falls back to counting undo steps
2026-10-10 17:21:25 -04:00
tools.rs
A failed MCP batch goes back to where it started however long the undo history is: rollback undid as many steps as the undo history had grown, but the history is capped at 200 steps, so once it was full a failed batch reported undone: 0 and left its sketches behind (an empty Sketch1, two sketches named TapHole). New commands edit.checkpoint and edit.restore_checkpoint (forget: true drops one) remember and restore the design, the active sketch and the undo history; batch takes a checkpoint before its first step, restores it on a failure and forgets it on success. Against an app without checkpoints batch falls back to counting undo steps
2026-10-10 17:21:25 -04:00