forked from 1b-agent/fieldcraft-upstream
A slow theory case: the corpus bracket meshed by mesh.hex.octree at 7, 5 and 4 mm, clamped at the base and loaded by 2 kN. Checks equilibrium, that every element is certified valid, the mesh volume against the CAD volume, the beam bending stress of the upright leg (sigma = M c / I = 145.3 MPa, within 5%) and the convergence of the fillet von Mises stress against the 4 mm mesh. Co-Authored-By: Claude Opus 5.5 <[email protected]> Claude-Session: https://claude.ai/code/session_01NmAttHhUZTokgPeEJia8sm